Surface restoration is a separate project stage
Rivne improvement rules describe control and completion of works on improvement objects. The practical lesson is to separate receiving the material, preparing the base and restoring the area. A product supplier cannot automatically decide who is responsible for a footway, road or green space.
Mark the vehicle position, package storage and handling route on the plan. If the route crosses shared or city land, confirm its conditions before ordering equipment.
Select the format
Split setts suit paths and complex outlines; sawn paving gives more precise geometry; slabs suit terraces and broad planes. Kerbs belong in the same layout.
| Stage | What to check |
|---|---|
| Specification | stone, format, finish, quantity |
| Access | gate, height, vehicle manoeuvre |
| Receiving | area and responsible contact |
| Base | who designs and builds it |
| Public realm | whether approval is required |
| Restoration | who returns the surface to the required condition |
NIKA GRAN does not claim an office, warehouse or completed projects in Rivne. Price, transport and date follow the specification.
Frequently asked questions
Who restores the surface after works?
The contract and the land owner’s requirements decide it. Product delivery does not automatically include restoration.
Can plates be ordered without installation?
Yes. List products, packing and delivery separately; works are agreed separately.
How is cutting allowance calculated?
It follows layout, cuts and defect zones rather than one universal percentage.
Explore the paving catalogue or send a plan.
Sources
Checked 14 October 2026. Confirm current requirements and restoration responsibility before work.