Do not confuse delivery with permission for works
The cited Ternopil City Council service card DDH 15-04-02 concerns cancellation of a permit to disturb improvement objects. It does not establish the issuance procedure or determine when a new permit is required. Distinguish delivery into private land from occupation of public space or excavation and confirm applicable approvals with the city authority. Cancellation periods must not be treated as issuance periods.
Give the supplier facts rather than assumptions: where the vehicle can stop, whether the gate is wide enough, who receives the load and where packages will be stored.
Specification before logistics
For a terrace or modern entrance, consider sawn paving; for paths and traditional paving, split setts; for large planes, slabs. Kerbs restrain the edge.
| Check | Quotation input |
|---|---|
| Address | gate or receiving point |
| Access | width, height, manoeuvring space |
| Load | package count and weight of each |
| Stone | type, format, finish |
| Public realm | whether footway or road is affected |
| Unloading | equipment and responsible operator |
NIKA GRAN does not claim an office, warehouse or completed projects in Ternopil. Price, route, vehicle and date are confirmed for the individual order.
Frequently asked questions
Is a city permit required for delivery?
Not always. Check where receiving the load or works disturb an improvement object or occupy public space.
Can packages be unloaded on the footway?
Do not assume this is permitted without agreement with the responsible party and a check of city requirements.
Which format suits a courtyard?
It depends on loading, geometry, base and the desired number of joints. Compare slab and sett samples.
Explore the paving catalogue or send the address and layout.
Sources
- Ternopil City Council: permit cancellation card, not issuance
- NIKA GRAN delivery terms
- Slabs or setts
Checked 14 October 2026. Confirm the current procedure and whether permission is needed before work.
Source clarification, 15 October 2026: document status and scope are distinguished from the practical supply checklist.



