Start with the required final condition
Record not only the future layout but also the condition required for the footway, road, kerb and green area after works. Photographs before work help distinguish existing defects from construction damage.
| Control | Record |
|---|---|
| Before works | photographs, boundary, responsible party |
| After lifting | units suitable for reuse |
| Before supply | ready package area |
| During laying | levels and drainage |
| At completion | restored surface and free access |
Granite setts suit local repair, while slabs form larger planes. Include sawn units and kerbs in one schedule.
NIKA GRAN does not claim an office, warehouse or completed projects in Poltava. Price, vehicle, route and date are determined individually.
Frequently asked questions
Who restores the footway?
City requirements, the land owner and the contractor agreement determine responsibility; the stone supplier does not assign it automatically.
Can lifted setts be reused?
Sometimes, after sorting, if units are undamaged and suit the design.
When should delivery be ordered?
After the receiving area is ready and packages will not obstruct access or work.
Paving catalogue · Send a schedule
Sources
- Poltava City Council: control of excavation and area restoration
- NIKA GRAN delivery terms
- Slabs or setts
Checked 14 October 2026. Confirm responsibility and current requirements before work.
Editorial clarification, 15 October 2026: general guidance does not replace checks of material, site condition or applicable local requirements.