Ordering granite paving for Mykolaiv: check before excavation starts

For a Mykolaiv supply, first determine whether the project is only receiving stone on private land or includes excavation, removal of footway surfacing or earthworks. The City Council has published enforcement examples for work without permission; NIKA GRAN supply does not replace a check of city requirements.

NIKA GRAN editorial team Published Updated
Ordering granite paving for Mykolaiv: check before excavation starts — article illustration
AI illustration for the article topic. Not a photograph of a completed project.

Separate materials from works

The stone specification records type, format, finish and quantity. The works plan records removal boundaries, base, drainage, barriers and restoration. They are separate documents with separate responsibilities.

Planned activity Check before supply
Private-courtyard receiving gate, area and unloading
Footway removal owner and approval for works
Earthworks current permit procedure
Temporary storage lawful safe location
Restoration material, schedule and responsible contractor

Compare split setts, sawn paving and slabs. Agree kerbs with levels and drainage.

NIKA GRAN does not claim an office, warehouse or completed projects in Mykolaiv. Current route feasibility, vehicle, price and date are checked for the request.

Frequently asked questions

Is permission needed if stone is only delivered into a courtyard?

Not automatically, but equipment and packages must remain on lawful land.

Who obtains permission for earthworks?

The current procedure and contractor agreement decide it; the product supplier is not automatically the applicant.

When should production start?

After the specification and a realistic receiving and works schedule are approved.

Paving catalogue · Send the technical brief

Source clarification, 15 October 2026. Decision No. 32/36 of 1 April 2005 was repealed by clause 2 of Decision No. 12/21 of 19 April 2007. The linked 2007 decision includes amendment links, but the availability of that publication does not establish current legal validity of every provision or completeness of the consolidated text. Before work, confirm applicable requirements and any permit with the responsible city authority. This article is not a legal opinion.

Sources

Checked 14 October 2026. Confirm permits and route on the order date.